|
Company Name |
Position |
From |
To |
Accomplishments |
|
Codman |
Systems Integrator |
Oct-99 |
Feb-00 |
-
Project Manager, Lead Architect and Technical Lead for
supporting all efforts associated with the National Sales Meeting in Hilton
Head Island, SC. Involved working with IBM Global Services for additional
support. Symantec Ghost software on two "traveling" MS NT v4.0 servers
combined with the enhancements made to the PowerBuilder application which
controlled the process ensured that the hardware and software upgrades were
applied successfully to all 100 laptop computers. Rolled out 50 new IBM
ThinkPad PC's. Transferred data from old PC to new PC. Rolled out Cognos
PowerPlay Client v6.5 and custom-designed and developed Business Review to
all Field users. Provided on-site training to 100 Field Sales Reps.
|
|
Codman |
Systems Integrator |
Oct-98 |
Dec-98 |
-
Project Manager, Lead Architect and Technical Lead for
supporting all efforts associated with the National Sales Meeting in La
Jolla, CA. Involved working with IBM Global Services for additional support.
Implementation of Install CD's combined with the enhancements made to the
PowerBuilder application which controlled the process ensured that the
hardware and software upgrades were applied successfully to all 100 laptop
computers. Rolled out Cognos PowerPlay Client v6.0 to all Field users.
Provided on-site training to 100 Field Sales Reps.
|
|
J&J Professional |
Project Leader |
May-98 |
Jul-98 |
|
|
J&J Orthopaedics |
Systems Integrator |
May-98 |
Jun-98 |
|
|
Codman |
Systems Integrator |
Oct-97 |
Dec-97 |
-
Lead Architect and Technical Lead for Supporting all efforts
associated with the National Sales Meeting in Scottsdale, AZ. In-House
developed IFIS (CRM) application was enhanced to integrate Windows Dial Up
Networking connectivity from within the application. Implementation of
Symantec Ghost software on two "traveling" MS NT v4.0 servers ensured that
the hardware and software upgrades were applied successfully to all 100
laptop computers. Rolled out Windows 95 to all Field users. Migration
process involved transferring user data from old laptop to server and back
down to new laptop. Developed a PowerBuilder application to control the
process. Migrated from Lotus cc:Mail to Outlook and Lotus 123 to MS Office.
Provided on-site training to 100 Field Sales Reps. Replaced old NECs with 50
new NECs.
|
|
Codman |
Systems Integrator |
Oct-96 |
Dec-96 |
-
Lead Architect and Technical Lead for Supporting all efforts
associated with the National Sales Meeting in Santa Monica, CA. This was the
most successful sales meeting ever. In-House developed IFIS (CRM)
application was enhanced to perform on-line pricing via remote connectivity
to the Oracle Production Pricing database running the Pricing Engine set of
Stored Procedures. Implementation of WinInstall on a "traveling" Netware
3.12 server ensured that the software upgrades were applied successfully to
all 100 laptop computers. Implemented FTP software's TCP/IP stack and SQLNet
for Oracle connectivity. Provided on-site training to 100 Field Sales Reps.
|
|
Boston Brace, International |
Network Installation and Support |
Sep-96 |
Oct-96 |
-
Design, Sales and Implementation of Routers and high-speed
modems in all 9 remote offices. Allowed rollout of email, and other IP
connectivity services (Telnet, WWW browsing, etc.) by all employees of the
corporation.
|
|
Boston Gas Company |
Systems Integrator |
Sep-96 |
Feb-97 |
-
Systems Planning, Integration and Implementation of the Voicelink II Upgrade. This included full integration of the system onto the
IP network, use of FTP for automated file transfers, ability to perform
multiple calling jobs simultaneously from multiple mainframe download files.
Also included a Meter Change (ERT) extract for scheduling meter changes /
upgrades.
|
|
Bradford Business Systems, Inc. |
Jul-96 |
Jul-96 |
|
|
Wainwright & Wainwright |
Network Support |
Jan-96 |
Jul-96 |
|
|
Wainwright & Wainwright |
Install MS WFW v3.11 Network - 10 User |
Dec-95 |
Dec-95 |
|
|
Bradford Business Systems, Inc. |
Dec-95 |
Dec-95 |
|
|
Boston Brace, International |
Network Installation and Support |
Aug-95 |
Sep-95 |
-
Design, Sales and Implementation of a Wide Area Network.
Initial sites included Walden, NYC, and Children's Hospital. Allowed full
integration of OSAS System as well as Patient Billing Systems over a 56K
Frame Relay network.
|
|
Boston Brace, International |
Network Installation and Support |
Aug-95 |
Aug-95 |
|
|
Irish American Partnership |
WFW Network Installation and Support |
Sep-94 |
Jul-97 |
|
|
Boston Gas Company |
Systems Integrator |
May-94 |
Jun-94 |
|
|
Boston Gas Company |
Systems Integrator |
Mar-94 |
Mar-94 |
|
|
Boston Gas Company |
PC Hardware/Software Support |
Jan-94 |
Feb-94 |
|
|
Boston Gas Company |
Systems Integrator |
Oct-92 |
Dec-92 |
|
|
Boston Gas Company |
PC Hardware/Software Support |
Aug-92 |
Aug-96 |
|
|
Bradford Business Systems, Inc. |
May-92 |
May-92 |
|
|
Boston Gas Company |
PC Hardware/Software Support |
Jan-92 |
Jun-92 |
|
|
Princess House, Inc. |
Senior Project Manager - Manufacturing Systems |
Apr-87 |
Oct-87 |
-
Responsible for all computer-based system supporting the
Operational areas of the Company including: Distribution, Customer Service,
Manufacturing and Marketing. Major accomplishments included: Requirements
definition, design and coordination of testing/implementation efforts for a
new Distribution system involving MIS, Distribution personnel and the USPS. First in-house system to utilize bar coding and a Dec MicroVax. Managed a
team of systems consultants in the analysis and design and justification of
a major order processing and Information retrieval system using the IBM
System/38.
|
|
Schawbel Corp |
Data Processing Consultant |
May-82 |
May-84 |
|